The roof structure is now mostly complete. The 35mm ply foam sandwich is integrated with the roof support beams and now makes a very stiff and strong roof. This strength will be needed to support the solar panels which when they are fitted later.
The only section left to complete is at the front of the cabin. This will be fitted once the cabin fronts have been added.