The lockers are framed out with support timbers and then the locker tops are cut to fit.
The locker tops are dry fitted so they can be removed to line the inside of the lockers with fibreglass and to complete the cutouts for the locker hatches.
The front deck on the second hull has been completed so now the deck lockers can be prepared.
The lockers are framed out with support timbers and then the locker tops are cut to fit. The locker tops are dry fitted so they can be removed to line the inside of the lockers with fibreglass and to complete the cutouts for the locker hatches.
8 Comments
Additional knees are added to support and strengthen the screen uprights and angled fillets are added to the bottom and sides ready for the plywood front screen surrounds.
The front side decks are fitted. The deck supports are fixed to the top of the bulkheads and then the ply wood decks are added.
Some of the decking is dry fitted as there are hatches to fit later. |