The cabin layout has been changed so there will now be a single berth in forward end of the starboard hull with the water maker equipment under the bed. The floors need to be leveled and heights set to accommodate the equipment.
Once the equipment is installed there will be no easy access to the voids under the floors and so conduit for the service pipes and cables are installed under the floor and the voids are filled with closed cell polyurethane foam. The foam strengthens the area below the waterline and reduces the risk of any water accumulating in the void.
The shower will be built in and so the floor level for this needs to be set with falls to allow the water to drain.
Once the equipment is installed there will be no easy access to the voids under the floors and so conduit for the service pipes and cables are installed under the floor and the voids are filled with closed cell polyurethane foam. The foam strengthens the area below the waterline and reduces the risk of any water accumulating in the void.
The shower will be built in and so the floor level for this needs to be set with falls to allow the water to drain.
The framing for the heads and shower roof is installed and the new stairs for access to the forward cabin are built.
Finally the new bulkhead to separate the shower from the forward cabin is added.