The heads and shower compartment has been lined out and the shower cubicle wall built.
The conduit runs for lights and power in this area have been installed. There are a lot of conduit runs and these terminate in a junction box inside the cabin wall. This will be accessed by a panel inside the heads compartment.
The location of all the equipment has to be decided to allow for mounting pads in the walls and for the service runs.
The shower floor was installed previously with the correct falls for drainage. A new plate for the shower waste has been fitted to the lowest point. There is very little space below the floor so a low profile shower trap is being used. Made by Wirquin it needs only 40mm below the floor.
Next jobs are to make the toilet base and cabinet for the basin.
The conduit runs for lights and power in this area have been installed. There are a lot of conduit runs and these terminate in a junction box inside the cabin wall. This will be accessed by a panel inside the heads compartment.
The location of all the equipment has to be decided to allow for mounting pads in the walls and for the service runs.
The shower floor was installed previously with the correct falls for drainage. A new plate for the shower waste has been fitted to the lowest point. There is very little space below the floor so a low profile shower trap is being used. Made by Wirquin it needs only 40mm below the floor.
Next jobs are to make the toilet base and cabinet for the basin.