4 small bulkheads were added to create deck lockers. The existing framing on the main bulkheads was shaped to match the bridge deck angle and additional timber was fixed the the hull sides to create a joint. The 3 sheets of plywood are butt jointed and fixed with screws and epoxy glue.
In total the bridge deck construction has taken about 100 hours.