The topside of the aft platform is complete. The centre section is permanently fixed to the top of the support framework. The sections over the hulls and tanks are dry fitted to allow services to be connected later. The bottom of the platform will be fitted later once all the service and control ducts have been fitted.
A 75mm duct has been fitted between the hulls to take the hydraulic tie bar and sanitation hoses.
A 75mm duct has been fitted between the hulls to take the hydraulic tie bar and sanitation hoses.