Once the floor beams have been installed the bridge deck and all the supports are coated in epoxy to make them waterproof. The floor supports are then fixed to the beams.
The wall support studs are fixed to the ends of the floor beams and also to the hull bulkheads.
The floor panels are then dry fitted to the floor supports They are dry fitted as the floor panels will need to be lifted to install the services.
With the floor fitted and the wall supports in place you can see the shape and size of the spaces in the hull and main cabin. The gaps in the sides of the cabin floor indicate where the three stairs will go down into the hulls.
The wall support studs are fixed to the ends of the floor beams and also to the hull bulkheads.
The floor panels are then dry fitted to the floor supports They are dry fitted as the floor panels will need to be lifted to install the services.
With the floor fitted and the wall supports in place you can see the shape and size of the spaces in the hull and main cabin. The gaps in the sides of the cabin floor indicate where the three stairs will go down into the hulls.